Status Type Decision ID Address Description DateValid
1Decided Full Planning Full Granted W/27589 CILHIR UCHAF, TALOG, CARMARTHEN, CARMS, SA33 6PF MICROGENERATION WIND TURBINE IN ADJOINING FIE... 2013-01-08
2Decided Full Planning Full Granted W/27717 LAND AT BLAENDYFFRYN, CAPEL IWAN ROAD, NEWCASTLE EMLYN, SA38 9LP INSTALLATION OF A SINGLE MICRO-SCALE WIND TUR... 2013-01-30
3Decided Full Planning Full Granted W/27842 LAND NORTH OF BLAENPANT FARM, BLAENPANT ROAD, CARMARTHEN, SA33 6EP INSTALLATION AND OPERATION OF A SINGLE SMALL ... 2013-02-22
4Decided Full Planning Full Granted W/27891 PENCLAWDD ISAF, RHOS, CARMS, SA44 5HF MICROGENERATION DOMESTIC WIND TURBINE IN ADJO... 2013-03-08
5Decided Full Planning Full Granted S/27660 NANTGWYN FARM, FELINFOEL, LLANELLI, CARMARTHENSHIRE, SA14 8JB THE PROPOSAL IS FOR THE ERECTION AND OPERATIO... 2013-03-11
6Decided Full Planning Withdrawn E/27916 LAND AT BRYNDU ISAF FARM, MAESYBONT, CARMARTHENSHIRE, SA14 7SS THE PROPOSAL IS FOR THE ERECTION AND OPERATIO... 2013-03-14
7Decided Full Planning Full Granted W/28026 LAND AT RHYDGOCH FIELD, BLAENWAUN, WHITLAND, SA34 0DT PROPOSED ERECTION OF A SINGLE WIND TURBINE UP... 2013-03-18
8Decided Full Planning Full Granted W/27975 PENLAN FARM, FOUR ROADS, KIDWELLY, CARMARTHENSHIRE, SA17 4SH ERECTION OF A WIND TURBINE... 2013-03-25
9Decided Full Planning Full Granted W/28023 LAND AT PEN Y GARN, NEWCASTLE EMLYN, SA38 9NW INSTALLATION OF TWO ENDURANCE 50KW WIND TURBI... 2013-04-08
10Decided Full Planning Full Granted W/28058 PLATEAU NORTH WEST OF PLASPARCAU FARM, CWMBACH, WHITLAND, SA34 0DT ERECTION OF A SINGLE WIND TURBINE WITH A MAXI... 2013-04-12
11Decided Full Planning Full Refusal S/28078 LAND AT BLAENLLIEDI FARM, PONTYBEREM, LLANELLI, SA15 5NN INSTALLATION OF 2NO. WTN 250KW WIND TURBINES ... 2013-04-17
12Decided Full Planning Full Granted W/28096 PLASGWYN FARM, CROESYCEILIOG, CARMARTHEN, SA32 8DU ERECTION OF WIND TURBINE... 2013-04-18
13Decided Full Planning Full Granted S/27576 EMLYCH FARM, HEOL DDU, LLANELLI, CARMS, SA15 4RP THE APPLICATION IS FOR THE INSTALLATION OF 2 ... 2013-04-24
14Decided Full Planning Full Refusal S/28130 LAND NEAR BRONDINI COTTAGES, FIVE ROADS, LLANELLI, SA15 5JQ INSTALLATION OF 3X 5KW WIND TURBINES AND ASSO... 2013-04-24
15Consideration Full Planning W/28172 LAND AT PANTGLAS FARM, LLANBOIDY, WHITLAND, CARMARTHENSHIRE, SA34 0EX ERECTION OF A WIND TURBINE... 2013-05-01
16Decided Full Planning Full Granted S/28209 LAND AT CILWNWG FACH, FELINFOEL, LLANELLI, SA14 8LZ INSTALLATION OF 3 X WIND TURBINES WITH A MAXI... 2013-05-08
17Decided Full Planning Full Granted W/28201 LAND AT, EASTPOOL FARM, PENDINE, CARMARTHENSHIRE, SA33 4PS ERECTION OF A WIND TURBINE... 2013-05-08
18Decided Full Planning Withdrawn W/28202 FOELCWAN FARM, HENFWLCH ROAD, CARMARTHEN, SA33 6AA ERECTION OF A WIND TURBINE... 2013-05-08
19Decided Full Planning Withdrawn W/28238 LAND AT, PARC CYNOG BUNGALOW, PENDINE, CARMARTHEN, CARMARTHENSHIRE, SA33 4PY ERECTION OF FREE STANDING 15M 5KW EVANCE R900... 2013-05-14
20Decided Full Planning Full Granted W/28280 LAND AT RHYD Y MERYDD, EFAILWEN, CLYNDERWEN, SA66 7XG INSTALLATION AND OPERATION OF A SINGLE SMALL ... 2013-05-22
21Decided Full Planning Full Granted W/28281 LAND AT BLAENGELLI, CWMBACH, WHITLAND, SA34 0DN THE INSTALLATION OF ONE C&F 50KW WIND TURBINE... 2013-05-22
22Decided Full Planning Full Refusal W/28283 LAND AT COTTAGE FARM, ABERNANT, CARMARTHEN, SA33 5RR ERECTION OF 2 X 30KW WIND TURBINES (32M TO TI... 2013-05-22
23Decided Full Planning Full Refusal W/28292 LAND AT DERWENDEG, MAESYBONT, LLANELLI, SA14 7HG INSTALLATION OF 2X30KW WIND TURBINES AND ASSO... 2013-05-23
24Decided Full Planning Full Granted W/28425 MAUDLAND HOUSE, CYNWYL ELFED, CARMARTHEN, SA33 6SX MICROGENERATION DOMESTIC WIND TURBINE IN ADJO... 2013-06-17
25Decided Full Planning Full Granted W/28431 RHYDHYWEL FAWR, CRWBIN, KIDWELLY, SA17 5DD ERECTION OF A SINGLE 55KW WIND TURBINE 34.5M ... 2013-06-18
26Decided Full Planning Full Granted W/28442 LAND AT WERN, PENCADER, SA39 9AL INSTALLATION OF A SINGLE WIND TURBINE WITH A ... 2013-06-19
27Decided Full Planning Full Refusal W/28489 LAND AT BRYNGWYN, FOUR ROADS, KIDWELLY, SA17 4SN ERECTION OF 2 X 30KW WIND TURBINES (MAX HEIGH... 2013-07-02
28Decided Full Planning Full Refusal S/28539 LAND AT BRYNGROES FAWR FARM, FIVE ROADS, LLANELLI, SA15 4RT ERECTION OF 2 X 30KW WIND TURBINES (25M MAST,... 2013-07-09
29Decided Full Planning Full Granted W/28581 LAND AT GWNDWN MAWR, MEINCIAU, KIDWELLY, SA17 5LH ERECTION OF A WIND TURBINE... 2013-07-18
30Decided Full Planning Full Granted W/28593 BRYNCOCH FARM, IDOLE, CARMARTHEN, SA32 8DX INSTALLATION OF A MICROGENERATION WIND TURBIN... 2013-07-22
31Decided Full Planning Full Granted E/28634 LAND AT PANTYBRYN, HEOL DDU, AMMANFORD, CARMARTHENSHIRE, SA18 2UG ERECTION OF 1NO. 20KW WIND TURBINE WITH A TIP... 2013-07-31
32Decided Full Planning Full Refusal E/28721 GLANRHYD, ABERGORLECH ROAD, CARMARTHEN, CARMS, SA32 7JU INSTALLATION OF MICROGENERATION 10KW WIND TUR... 2013-08-16
33Decided Full Planning Full Refusal W/28748 FIELD OFF PORTWAY, LLANSAINT, SA17 5JP ERECTION AND INSTALLATION OF A SINGLE 50KW EN... 2013-08-20
34Decided Full Planning Full Refusal W/28754 LAND AT GLANDY MAWR, EFAILWEN, CLYNDERWEN, SA66 7RS ERECTION OF ONE 55KW WIND TURBINE AND ASSOCIA... 2013-08-20
35Decided Full Planning Full Refusal W/28761 LAND AT BLAEN LLAIN, CWMBACH, LLANBOIDY, CARMARTHENSHIRE, SA34 0DT INSTALLATION OF A DOMESTIC 20KW WIND TURBINE ... 2013-08-22
36Decided Full Planning Full Granted W/28764 LAND NEAR ESGAIRWEN ISAF, CWMANN, LAMPETER, SA48 8HH ERECTION OF 1 NO. 20KW WIND TURBINE WITH A 20... 2013-08-23
37Appealed Full Planning Full Refusal E/28824 LAND AT MAESCADOG, CAIO, LLANWRDA, CARMARTHENSHIRE, SA19 8PP ERECTION OF A WIND TURBINE, MEASURING 50M TO ... 2013-09-05
38Consideration Full Planning W/28831 YNYS FACH FARM, EFAILWEN, CARMS ERECTION OF 100KW WIND TURBINE AND ASSOCIATED... 2013-09-05
39Decided Full Planning Full Granted W/28839 ESGERFA FARM, ABERNANT, CARMARTHEN, SA33 5RG ERECTION OF A SINGLE WIND TURBINE... 2013-09-09
40Decided Full Planning Full Refusal W/28848 YSGUBORWEN, BANCFFOSFELEN, LLANELLI, SA15 5DR INSTALLATION OF 2 X 30KW WIND TURBINES AND AS... 2013-09-11
41Decided Full Planning Full Granted W/28851 CEFNMAES FARMHOUSE, ALLTWALIS, CARMARTHEN, SA32 7EG INSTALLATION OF SINGLE SMALL SCALE WIND TURBI... 2013-09-11
42Decided Overhead Line Overhead line Approval W/28862 LAND NEAR WHITE LION, WHITLAND, SA34 0PA UPGRADE 3.25KM OF EXISTING 11KV OVERHEAD LINE... 2013-09-13
43Decided Full Planning Full Refusal W/28865 LAND NORTH OF BLAENPANT, CWMBACH, WHITLAND, SA34 0DU INSTALLATION OF 2 NO. SMALL SCALE WIND TURBIN... 2013-09-13
44Decided Full Planning Full Granted W/28994 PENLAN ISAF FARM, PORT WAY, FERRYSIDE, KIDWELLY, SA17 5JR SINGLE SMALL WIND TURBINE DEVELOPMENT - TURB... 2013-10-07
45Decided Full Planning Full Granted E/29003 DOL Y BONT (CAE COCH), CAPEL ISAAC, LLANDEILO, CARMARTHENSHIRE, SA19 7UA CHANGE OF USE OF AGRICULTURAL BUILDING AND LA... 2013-10-09
46Decided Full Planning Full Granted W/29015 LAND AT PENTREMAWR, RHYDARGAEAU, CARMARTHEN, SA33 6BH INSTALLATION OF A SINGLE ENDURANCE E-3120 (50... 2013-10-09
47Decided Full Planning Full Granted W/29016 FOELCWAN FARM, HENFWLCH ROAD, CARMARTHEN, CARMARTHENSHIRE, SA33 6AA ERECTION OF A WIND TURBINE - RESUBMISSION OF ... 2013-10-09
48Consideration Full Planning E/29031 LAND SOUTH WEST OF BRYN DAFYDD, LLANSAWEL, CARMS, SA19 7SL SINGLE WIND TURBINE OF MAXIMUM TIP HEIGHT 86.... 2013-10-16
49Decided Full Planning Full Granted W/29042 LAND AT COEDEIDDIG FACH, CWMANN, LAMPETER, SA48 8EU INSTALLATION OF A SINGLE SMALL SCALE WIND TUR... 2013-10-16
50Decided Full Planning Full Refusal W/29048 LAND ADJACENT TO CRUG YR AST, BLAEN CWARAU, HERMON, CARMARTHENSHIRE, SA33 6SS ERECTION OF 1 NO 50KW ENDURANCE WIND TURBINE ... 2013-10-17
51Decided Full Planning Full Granted W/29064 LAND AT NEUADD, MEIDRIM, CARMARTHEN, SA33 5PW CONSTRUCTION AND OPERATION OF TWO 50KW WIND T... 2013-10-23
52Decided Full Planning Full Granted W/29103 LAND ADJACENT TO, COED ADAM, LLANGYNDEYRN, KIDWELLY, SA17 5EU INSTALLATION OF 75KW WIND TURBINE OF 39.6M TO... 2013-10-30
53Decided Full Planning Full Granted W/29104 CLYNGWYN, EFAILWEN, CLYNDERWEN, SA66 7XH ERECTION OF 100KW WIND TURBINE AND ASSOCIATED... 2013-10-30
54Appealed Full Planning Non-determination - gone to appeal W/29119 NANTGERDINEN, CYNWYL ELFED, CARMARTHEN, SA33 6UT ONE WIND TURBINE 30M TO THE HUB AND 45M TO T... 2013-11-06
55Decided Full Planning Full Granted S/29233 LAND AT BLAENLLIEDI FARM, PONTYBEREM, LLANELLI, SA15 5NN INSTALLATION OF 2NO. WTN 250KW WIND TURBINES ... 2013-11-22
56Appealed Full Planning Full Refusal W/29252 TRIOL-BACH, CYNWYL ELFED, CARMARTHEN, SA33 6SS INSTALLATION OF SINGLE SMALL SCALE WIND TURBI... 2013-11-27
57Decided Full Planning Full Granted W/29284 GLANCORRWG, LLANPUMSAINT, CARMARTHEN, SA33 6LX INSTALLATION OF A SINGLE SMALL SCALE WIND TUR... 2013-12-06
58Decided Full Planning Full Granted W/29322 RHYDYGWIN, CYNWYL ELFED, CARMARTHEN, SA33 6SU INSTALLATION OF SINGLE SMALL SCALE WIND TURBI... 2013-12-12
59Decided Full Planning Full Granted W/29340 LAND AT YSGUBOR GWAIR, HERMON, SA33 6SY INSTALLATION OF A SINGLE SMALL SCALE WIND TUR... 2013-12-16